With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
Client:
Project: EGL2 (Eastern Green Link 2) Ducting Installation
Location: Peterhead
Start date:
End Date
Duration:
Contract Value:
Eastern Green Link 2 (EGL2) is the largest ever project in the UK transmission system—a 505-kilometre subsea electricity link connecting Peterhead in Scotland to Drax in England via a 2GW HVDC cable. As part of this nationally significant infrastructure scheme, Aaron Engineering Group was required to install cable ducting infrastructure at Peterhead to connect an SSE substation through to a new DC converter station. The project demanded installation of two separate 400kV circuits (Circuit 1: 610m and Circuit 2: 600m), each requiring different ducting specifications and troughing systems that crossed the site at different points and connected to two horizontal directional drills. The works required meticulous planning, coordination, and execution to ensure alignment with programme and quality expectations whilst working within complex site constraints and maintaining the highest safety standards on this critical national infrastructure project.
Aaron Engineering Group was procured by NKT to deliver comprehensive ducting installation works between March and August 2026. Our scope included:
Cable Ducting Installation:
Excavation and Groundworks:
Site Management and Sustainability:
Works were delivered with strong safety leadership, robust procedures, and proactive safety culture throughout all activities.
This project demonstrates Aaron Engineering Group’s capability to deliver critical infrastructure ducting works on the UK’s largest transmission system project. Through innovative application of modern installation techniques—including GPS-VRS excavator systems and custom V bucket solutions—our teams ensured precise, safe excavation and duct installation within complex site constraints. The integration of digital systems for monitoring, reporting, and site management, combined with our commitment to sustainability through Euro 6 compliance and paperless operations, showcases how forward-thinking approaches enhance efficiency, accuracy, and delivery performance. The delivery of this critical cable infrastructure at Peterhead demonstrates Aaron’s technical excellence and contributes directly to the EGL2 project’s objectives of enhancing the UK’s renewable energy transmission capability and supporting clean energy targets.