With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
Client:
Start date:
End date:
Duration:
Value:
Gravesend Station required significant infrastructure upgrades as part of the Kent Train Lengthening Programme to accommodate 12-car trains on a busy commuter route into London. The works involved constructing a new platform and extending two existing platforms, requiring the removal of existing structures and installation of new compliant infrastructure to improve accessibility and passenger movement. Delivery needed to be achieved within a constrained rail environment, including a tightly programmed 15-day Christmas blockade, whilst maintaining the highest standards of safety, quality, and programme certainty in a live operational station.
Aaron Rail worked collaboratively with principal contractor C Spencer Ltd to deliver key civils and rail activities over a 22-week programme. Our scope was delivered during the critical blockade period and included:
All works were integrated with the construction of a new AFA-compliant footbridge with lifts, ensuring coordinated delivery across the complex station remodelling programme.
This project demonstrates Aaron Rail’s capability to deliver complex, multi-disciplinary works within challenging operational constraints. By providing flexible specialist labour and integrating seamlessly with the principal contractor’s programme, our teams contributed to transformational capacity improvements on a vital commuter route whilst maintaining operational safety and programme certainty throughout a critical Christmas blockade period.