With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
Client:
Project: Garth & Minffordd CSEC 400kV HV Plant
Location: Garth & Minffordd
Start date:
End date:
Duration:
Contract Value:
Aaron HV was required to install new 400kV HV plant at the Garth and Minffordd Cable Sealing End Compounds (CSEC) to support the newly installed cable system, for which Aaron HV is also responsible. The compounds form the critical termination point for the 400kV cable circuits, so the plant had to be designed, supplied, and installed to integrate fully with the cable system and the earthing arrangements at each site. The scope covered a significant number of high-voltage components, including 24 cable sealing end structures with slip-over CTs, 12 surge arresters, 12 earth switches, associated 400kV busbar connectors, and the CSE compound earthing system, all supported by new steel structures.
Aaron HV is providing the design, supply, and installation of all 400kV HV plant at both compounds, working as a single package with the cable installation. Our scope includes:
Design and Supply:
Installation:
This project demonstrates Aaron HV’s capability to deliver complete high-voltage plant packages, from design through to installation, on critical 400kV transmission infrastructure. Because Aaron HV is responsible for both the cable system and the compound plant, our teams provide a single point of accountability that improves coordination, reduces interface risk, and ensures the plant and cable systems work together as designed. The scheme supports the wider Garth and Minffordd connection, contributing to the reliable transmission capacity that underpins the energy network.