With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
With over 25 years of proven expertise, Aaron Engineering Group provides comprehensive design, build, and maintenance services, supporting both public and private sector clients in delivering essential infrastructure projects.
Gates & Barriers
Automatic Doors
Industrial & Commercial Doors
Turnstiles & Pedestrian Access
Vehicle Access & Bollards
Fencing Solutions
Steel & Timber Fire Doors & Security Doors
Car Park Systems
Emergency Call-Outs
Advanced CCTV & ANPR Solutions
Intruder Detection Systems
Access Control Systems
Fire Detection & Life Safety Systems
Genetec Partner
Emergency Call-Outs
Automated Access Solutions PPMs
CCTV, Fire, Intruder & Access Control PPMs
Mechanical, Electrical and HVAC
Passive Fire Maintenance & Compliance
Building Fabric & External Infrastructure
Our PPM Offering
Emergency Call-Outs
Client:
Project: Snowdonia Visual Impact Provision (VIP) – 400kV Cable Routing Design and Installation
Location: Snowdonia, North Wales
Start date:
End date:
Duration:
Contract Value:
As part of National Grid’s Visual Impact Provision (VIP) Project, Aaron HV was required to deliver the complete end-to-end cable routing design and installation of 400kV cables throughout the newly constructed Snowdonia tunnel. The project presented a demanding combination of engineering challenges, including the design and installation of 12 cables and their steelwork support within a 3.5m diameter tunnel, the design of transition and transposition support frameworks at the tunnel joint bays, and the construction of significant tower steelwork for the 12m and 60m shafts at each end of the tunnel. Installing cables of this scale required the steel support structures, standard sag brackets, and temporary guides and rollers to be fully in place before pulling 36 lengths of cable, each over 1km long and weighing around 37kg/m.
Aaron HV is delivering the complete design and installation package for the 400kV circuits, from initial routing through to final installation. Our scope includes:
Design:
Supply and Installation:
This project demonstrates Aaron HV’s capability to deliver complete design-and-build packages for high-voltage cable infrastructure in challenging underground environments. By providing full 3D modelling, bespoke support design, and installation within a constrained 3.5m tunnel, our teams deliver an integrated solution that connects design intent directly to on-site delivery. Our involvement across the tunnel, shafts, and cable sealing end compounds supports National Grid’s Visual Impact Provision objectives, contributing to critical 400kV transmission capacity while minimising the visual impact of the infrastructure on the Snowdonia landscape.