Project: Snowdonia VIP HV Cable

Key Project Details

Client:

Project: Snowdonia Visual Impact Provision (VIP) – 400kV Cable Routing Design and Installation

Location: Snowdonia, North Wales

Start date:

End date:

Duration:

Contract Value:

The Challenge

As part of National Grid’s Visual Impact Provision (VIP) Project, Aaron HV was required to deliver the complete end-to-end cable routing design and installation of 400kV cables throughout the newly constructed Snowdonia tunnel. The project presented a demanding combination of engineering challenges, including the design and installation of 12 cables and their steelwork support within a 3.5m diameter tunnel, the design of transition and transposition support frameworks at the tunnel joint bays, and the construction of significant tower steelwork for the 12m and 60m shafts at each end of the tunnel. Installing cables of this scale required the steel support structures, standard sag brackets, and temporary guides and rollers to be fully in place before pulling 36 lengths of cable, each over 1km long and weighing around 37kg/m.

What We Did

Aaron HV is delivering the complete design and installation package for the 400kV circuits, from initial routing through to final installation. Our scope includes:

Design:

  • Full 3D modelling of 12 cables and steelwork support within the 3.5m diameter tunnel
  • Design of the transition and transposition support frameworks at the tunnel joint bays
  • Design of the standard support brackets to facilitate cable sag

Supply and Installation:

  • Supply and installation of the standard support brackets across the tunnel
  • Build of the transition and transposition support frameworks at the tunnel joint bays
  • Construction of the tower steelwork for the 12m and 60m shafts at each end of the tunnel
  • Installation of all 400kV circuits throughout the tunnels, shafts, and cable sealing end compounds
  • Installation of temporary guides and rollers to support cable pulling operations
  • Pulling of 36 lengths of cable, each over 1km long and weighing approximately 37kg/m

The Outcome

  • Complete end-to-end 400kV cable routing design delivered for the Snowdonia tunnel
  • 3D modelling completed for 12 cables and associated steelwork support
  • Steel support structures and shaft tower steelwork delivered ahead of cable installation (TBC)
  • Cable pulling operations completed across all 36 lengths (TBC – in progress)

Added Value

This project demonstrates Aaron HV’s capability to deliver complete design-and-build packages for high-voltage cable infrastructure in challenging underground environments. By providing full 3D modelling, bespoke support design, and installation within a constrained 3.5m tunnel, our teams deliver an integrated solution that connects design intent directly to on-site delivery. Our involvement across the tunnel, shafts, and cable sealing end compounds supports National Grid’s Visual Impact Provision objectives, contributing to critical 400kV transmission capacity while minimising the visual impact of the infrastructure on the Snowdonia landscape.