Westbury AHD – Access Control Infrastructure Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive civil engineering works at the Westbury AHD facility to support the installation of new access control infrastructure. The project presented significant technical challenges including excavations around live water and electrical services, reinforced concrete structures beneath existing fence lines, and […]

Palisade Fencing & Access Preparation Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to carry out site works to support the installation of palisade fencing and prepare surrounding infrastructure for access improvements. The project demanded careful coordination of fencing installation with assessment of existing site conditions, including infrastructure beneath the weighbridge area […]

Tonbridge Gate & Pedestrian Access Installation

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to deliver civil engineering works in Tonbridge to support the installation of new vehicle and pedestrian access gates as part of an access control infrastructure upgrade. The project demanded precise foundation construction for both gate types, comprehensive duct installation […]

Horden Station

Key Project Details Client: Start date: End date: Duration: Value: The Challenge The Durham coast line required a new two-platform railway station at Horden to serve the local community and support economic regeneration in the area. The station needed to provide modern, accessible facilities with level, step-free access from the adjacent car park to both […]

Trough Route – Ipswich Chord / Yard

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive infrastructure works as part of the £60 million Ipswich Chord project to enhance freight distribution from Britain’s largest container port. The project comprised four new bridges, two new embankments, a 413-metre retaining wall, and 2.4 kilometres of new track […]

Hillhouse Depot – Fire Protection

Aaron Access delivered a full fire and security upgrade at Hill House Sidings for Amey – a project taken on at extremely short notice for a site that plays an operationally critical role in the Transpennine Route Upgrade (TRU). Our team mobilised immediately and completed all works to a standard that exceeded expectations.

Co-op Arena Speedlanes

Aaron Access delivered a major access-control upgrade at the Co-op headquarters at Angel Square, Manchester, supplying and installing 36 DDA-compliant speedlanes across a range of core building locations.

NWR Gateshead – Bi Folding Gate

At the Gateshead Network Rail facility, Aaron Access delivered a full modernisation of the site’s ageing and unreliable access infrastructure.

NWR Totton – Cantilever Gate

At the Totton site, Aaron Access delivered a comprehensive security and access management upgrade designed to improve safety, efficiency, and site control.

Balfour Beatty – TransPennine Route Upgrade (TRU W2BC)

Key Project Details Client: Project: TransPennine Route Upgrade – W2BC Location: Manchester to Huddersfield Start date: End date: Duration: Contract Value: Guards Deployed: 10+ Hours Delivered: 2,000+ The Challenge The TransPennine Route Upgrade between Manchester and Huddersfield is a complex, long-term infrastructure programme delivered in live rail and public environments, scheduled for completion in 2032. […]