NWR CPNI–Compliant Security Overhaul

Mitie Facilities commissioned Aaron Access to enhance perimeter security at a regional Rail Operating Centre, a Centre for the Protection of National Infrastructure (CPNI) high-security site.

NWR Site Upgrade

Network Rail required an upgrade to one of its maintenance depot units. Aaron Access provided the installation of a bi-folding gate to provide enhanced security and access control at the site, with gates that combine functionality, durability, and sleek design.

TRU West / Hope Valley – Security Services

Key Project Details Client: Project: TransPennine Route Upgrade – TRU West & Hope Valley Location: Manchester to Leeds, Hope Valley (various locations) Duration: Programme Value: The Risk Identified The TransPennine Route Upgrade (TRU) is a multi-billion-pound, long-term rail infrastructure programme delivered across live railway, urban, and rural environments between Manchester, Huddersfield, Leeds and York, including works within […]

Network Rail – Security & Suicide Prevention

Key Project Details Client: Service: Security & Suicide Prevention Location: North West & Central, Eastern Region Duration: Value: The Risk Identified Network Rail identified an increased risk of suicide and trespass incidents at stations and static rail locations across the North West & Central and Eastern regions. These incidents posed a serious risk to life, caused operational disruption, and […]

Gravesend Station Remodelling

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Gravesend Station required significant infrastructure upgrades as part of the Kent Train Lengthening Programme to accommodate 12-car trains on a busy commuter route into London. The works involved constructing a new platform and extending two existing platforms, requiring the removal of existing structures […]

GRP Handrail and Walkway – Hitachi Depot

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Hitachi’s depot required a designated safe walking route for drivers and staff to mitigate operational safety risks within the facility. The solution needed to provide robust, durable pedestrian infrastructure whilst supporting sustainability objectives and minimising environmental impact. The installation required careful coordination within […]