Horden Station

Key Project Details Client: Start date: End date: Duration: Value: The Challenge The Durham coast line required a new two-platform railway station at Horden to serve the local community and support economic regeneration in the area. The station needed to provide modern, accessible facilities with level, step-free access from the adjacent car park to both […]
Trough Route – Ipswich Chord / Yard

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive infrastructure works as part of the £60 million Ipswich Chord project to enhance freight distribution from Britain’s largest container port. The project comprised four new bridges, two new embankments, a 413-metre retaining wall, and 2.4 kilometres of new track […]
Hillhouse Depot – Fire Protection

Aaron Access delivered a full fire and security upgrade at Hill House Sidings for Amey – a project taken on at extremely short notice for a site that plays an operationally critical role in the Transpennine Route Upgrade (TRU). Our team mobilised immediately and completed all works to a standard that exceeded expectations.
Co-op Arena Speedlanes

Aaron Access delivered a major access-control upgrade at the Co-op headquarters at Angel Square, Manchester, supplying and installing 36 DDA-compliant speedlanes across a range of core building locations.
NWR Gateshead – Bi Folding Gate

At the Gateshead Network Rail facility, Aaron Access delivered a full modernisation of the site’s ageing and unreliable access infrastructure.
NWR Totton – Cantilever Gate

At the Totton site, Aaron Access delivered a comprehensive security and access management upgrade designed to improve safety, efficiency, and site control.
Balfour Beatty – TransPennine Route Upgrade (TRU W2BC)

Key Project Details Client: Project: TransPennine Route Upgrade – W2BC Location: Manchester to Huddersfield Start date: End date: Duration: Contract Value: Guards Deployed: 10+ Hours Delivered: 2,000+ The Challenge The TransPennine Route Upgrade between Manchester and Huddersfield is a complex, long-term infrastructure programme delivered in live rail and public environments, scheduled for completion in 2032. […]
Snowdonia VIP HV Plant

Aaron HV is providing the installation of new 400kV HV Plant at the Garth & Minffordd Cable Sealing End Compounds (CSEC) to support the newly installed cable system (for which we are also responsible for).
EGL2

Aaron HV is providing the design & installation of new 400kV circuits between the newly constructed converter stations and the existing 400kV SSE & National Grid substations at Peterhead and Drax (respectively).
BritNed POA

Aaron HV is providing the design & installation of new physical and electronic security systems on behalf of National Grid Ventures at both of the BritNed sites in the UK & NL.






