Didcot Core Hub – Unified Security System Upgrade

Key Project Details Client: Project: Unified Security System Upgrade Location: Didcot Core Hub Start date: End Date Duration: Contract Value: The Challenge Network Rail required a comprehensive upgrade of security infrastructure at the Didcot Core Hub to replace ageing CCTV, access control, and intercom systems with a unified, modern security environment. The existing infrastructure consisted […]
NWR Totton – Bespoke Fire Alarm System

Key Project Details Client: Start date: End Date Duration: Contract Value: The Challenge Network Rail required a comprehensive upgrade of security infrastructure at the Didcot Core Hub to replace ageing CCTV, access control, and intercom systems with a unified, modern security environment. The existing infrastructure consisted of disparate systems that lacked integrated functionality, creating gaps […]
Network Rail HVM Crash-Rated Gate Upgrade

Key Project Details Client: Project: HVM Crash-Rates Gate Upgrade Location: TBC Start date: End date: Duration: Contract Value: Guards Deployed: 10+ Hours Delivered: 2,000+ The Challenge Network Rail required an urgent upgrade to entrance security systems, replacing non-crash-rated automatic gates and road blockers with a certified hostile vehicle mitigation (HVM) solution. The existing infrastructure did […]
Amey TRU West – Security Services

Key Project Details Client: Project: TransPennine Route Upgrade – TRU West & Hope Valley Location: Manchester to Leeds, Hope Valley (various locations) Duration: Programme Value: The Risk Identified The TransPennine Route Upgrade (TRU) is a multi-billion-pound, long-term rail infrastructure programme delivered across live railway, urban, and rural environments between Manchester, Huddersfield, Leeds and York, including works within […]
Volker Rail + Story JV Hope Valley – Security Services

Key Project Details Client: Project: TransPennine Route Upgrade – TRU West & Hope Valley Location: Manchester to Leeds, Hope Valley (various locations) Duration: Programme Value: The Risk Identified The TransPennine Route Upgrade (TRU) is a multi-billion-pound, long-term rail infrastructure programme delivered across live railway, urban, and rural environments between Manchester, Huddersfield, Leeds and York, including works within […]
TransPennine Route Upgrade (TRU West) – Multi-disciplinary and Functional Offering

Key Project Details Client: Project: TransPennine Route Upgrade (TRU) Location: Manchester to York Start date: End date: Duration: Contract Value: Guards Deployed: 10+ Hours Delivered: 2,000+ The Challenge The TransPennine Route Upgrade (TRU) is a transformative, multi-billion pound railway programme designed to better connect passengers in the North between Manchester, Huddersfield, Leeds and York. Stretching […]
Under-Road Utility Crossing at Wrenhall – Eastern Green Link 2 (EGL2)

Key Project Details Client: Start date: End date: Duration: Value: The Challenge As part of the Eastern Green Link 2 (EGL2) programme, Aaron Engineering Group was required to install a strategic under-road utility crossing (URX) at Wrenhall to support the full HV cable route delivery by BAM. The crossing formed a critical interface where the […]
Westbury AHD – Access Control Infrastructure Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive civil engineering works at the Westbury AHD facility to support the installation of new access control infrastructure. The project presented significant technical challenges including excavations around live water and electrical services, reinforced concrete structures beneath existing fence lines, and […]
Palisade Fencing & Access Preparation Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to carry out site works to support the installation of palisade fencing and prepare surrounding infrastructure for access improvements. The project demanded careful coordination of fencing installation with assessment of existing site conditions, including infrastructure beneath the weighbridge area […]
Tonbridge Gate & Pedestrian Access Installation

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to deliver civil engineering works in Tonbridge to support the installation of new vehicle and pedestrian access gates as part of an access control infrastructure upgrade. The project demanded precise foundation construction for both gate types, comprehensive duct installation […]