Under-Road Utility Crossing at Wrenhall – Eastern Green Link 2 (EGL2)

Key Project Details Client: Start date: End date: Duration: Value: The Challenge As part of the Eastern Green Link 2 (EGL2) programme, Aaron Engineering Group was required to install a strategic under-road utility crossing (URX) at Wrenhall to support the full HV cable route delivery by BAM. The crossing formed a critical interface where the […]

Westbury AHD – Access Control Infrastructure Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive civil engineering works at the Westbury AHD facility to support the installation of new access control infrastructure. The project presented significant technical challenges including excavations around live water and electrical services, reinforced concrete structures beneath existing fence lines, and […]

Palisade Fencing & Access Preparation Works

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to carry out site works to support the installation of palisade fencing and prepare surrounding infrastructure for access improvements. The project demanded careful coordination of fencing installation with assessment of existing site conditions, including infrastructure beneath the weighbridge area […]

Tonbridge Gate & Pedestrian Access Installation

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Aaron Group was required to deliver civil engineering works in Tonbridge to support the installation of new vehicle and pedestrian access gates as part of an access control infrastructure upgrade. The project demanded precise foundation construction for both gate types, comprehensive duct installation […]

Horden Station

Key Project Details Client: Start date: End date: Duration: Value: The Challenge The Durham coast line required a new two-platform railway station at Horden to serve the local community and support economic regeneration in the area. The station needed to provide modern, accessible facilities with level, step-free access from the adjacent car park to both […]

Trough Route – Ipswich Chord / Yard

Key Project Details Client: Start date: End date: Duration: Value: The Challenge Network Rail required comprehensive infrastructure works as part of the £60 million Ipswich Chord project to enhance freight distribution from Britain’s largest container port. The project comprised four new bridges, two new embankments, a 413-metre retaining wall, and 2.4 kilometres of new track […]